economy
May 9, 2026
Calle Colombia in Olaya Herrera gets new pavement: 400 families to benefit
The work represents a significant transformation for this sector of the city, historically affected by mobility problems and the accumulation of rainwater.

TL;DR
- 793 linear meters of rigid concrete pavement constructed on Calle Colombia.
- Project scope expanded by 168 meters based on community feedback.
- Includes a new sewage system for the final stretch of the road.
- A new rainwater channel was built to direct water to the Ricaurte canal.
- Addresses historical flooding issues and mobility problems in the sector.
- Replaces muddy surfaces with stable conditions for pedestrians and vehicles.
- Investment of $5.048 million as part of the Vial Mesh Rehabilitation Phase 2.
- Aims to provide dignity and resolve historical infrastructure challenges for the Olaya Herrera community.